centegra heatlh systems
CLIENT: Image 

Centegra Health Systems
Memorial Medical Center
Woodstock, IL 

 CHALLENGE:

To supply and install new nurse stations in an existing, fully operative hospital.

Time frame necessitated: 6 weeks.

 
SOLUTION:
 
Oakwood first met with the Centegra design team several times to establish a comprehensive plan of action. Oakwood provided Centegra with a detailed schedule, interviewed and hired the necessary subcontractors and began the project by building a visqueen “bubble” around the work area for health/safety purposes. As select demolition began at each station, the first half of each new nurse station was installed in order to keep the areas in full operation. The nurses were able to effectively work from the first completed half of the nurse stations as Oakwood finished construction on the other half. All custom nurse stations were built by Oakwood with laminated half wall radius tops, supplied file cabinets, pencil drawers and custom chart rack cabinets.
 
RESULT:
 
Each station took about two weeks to complete and never shut down. Upon completion of the project, all nurse stations ran smoothly and the layout was perfect. There were no safety issues and the customer is completely satisfied with the end result.

[ Back ]

 

© 2009 Oakwood Contractors, Inc. All Rights Reserved.